QatarEnergy Ready to Resume LNG Output at Ras Laffan Within One Month
QatarEnergy can restart LNG production at Ras Laffan and reach full capacity within one month, with shipping identified as the main constraint rather than plant operations.
QatarEnergy stands ready to resume LNG production at Ras Laffan and can reach full output within one month, according to a source with knowledge of the situation. The main constraint on LNG output at the facility is shipping availability, not production capacity, the source said. The speed at which QatarEnergy can bring in ships will determine how quickly output resumes, the same source added.
@DeItaone reported the statements from the source with knowledge.


