Unbiased AI-powered news
@FirstSquawk reported that an earth pressure balance shield machine with an 11.16-meter excavation diameter and 105-meter length left the production line in north China's Tianjin. The machine will support Riyadh's Metro Line 2 extension project.
China's first shield tunneling machine for export to Saudi Arabia has rolled off the production line in north China's Tianjin. @FirstSquawk reported that the earth pressure balance shield machine measures 11.16 meters in excavation diameter and about 105 meters in overall length. It is set to support construction of Riyadh's Metro Line 2 extension project.
The project spans 8.4 km and includes a 6-km shield tunneling section.
Single source — no framing comparison available.
Top stories every evening. Bias-free. Ranked for relevance.
eaworldview.comRussian strikes targeted eight Ukrainian regions, triggering blasts and air raid sirens in Kyiv. Ukrainian defenses engaged the projectiles while damage assessments began. No casualty figures were issued in initial reports.
en.antaranews.comEmissions rose 1.1 percent to 41.0 billion metric tons, driven by a U.S. rebound even as renewables covered the full net increase in global electricity generation. China’s growth nearly stalled while non-OECD nations accounted for 70.5 percent of the total.
forbes.comThe group ratified a quota hike during a Sunday video conference after seven members added nearly 800,000 barrels per day since April. Output remains below pre-war levels amid recovering exports through the Strait of Hormuz.